e2dc7552c2
SAP, syslog and health/temperatures are done and verified. The VLAN split needs a tagged VLAN with DHCP on the switch and is only needed for the internet sources, so it moves to a phase 2 section. Step 4 notes what is still open (Riedel import, Wireshark). Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>