Build order: step 5 done without VLAN; VLAN split parked for phase 2
SAP, syslog and health/temperatures are done and verified. The VLAN split needs a tagged VLAN with DHCP on the switch and is only needed for the internet sources, so it moves to a phase 2 section. Step 4 notes what is still open (Riedel import, Wireshark). Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
@@ -98,7 +98,7 @@ When this device is the GM, offset/frequency/delay show "–".
|
||||
- Channel selection: which channel of the stream feeds a mono output.
|
||||
|
||||
## Network
|
||||
- Default: one untagged interface. VLAN split option: AES67 untagged + internet tagged (inet.vlan_id/pcp) using the ESP-IDF vlan_support approach (examples/network/vlan_support, ESP32-P4 supported). AES67 side has no gateway; default route and DNS are on inet.
|
||||
- Default: one untagged interface. VLAN split (phase 2, not implemented yet) option: AES67 untagged + internet tagged (inet.vlan_id/pcp) using the ESP-IDF vlan_support approach (examples/network/vlan_support, ESP32-P4 supported). AES67 side has no gateway; default route and DNS are on inet.
|
||||
- PTP, RTP, SAP and IGMP bind to the AES67 netif. HTTP server filters on `web_on`.
|
||||
- DHCP sends net.hostname (option 12), so the router's lease list / local DNS shows it; after a rename it applies at the next lease renewal.
|
||||
- mDNS (espressif/mdns): `<net.hostname>.local` plus the web UI as `_http._tcp` port 80. A hostname change applies live (the new name answers after ~1 s of RFC 6762 probing).
|
||||
|
||||
Reference in New Issue
Block a user